Single Container Integrated Data Center
Program Introduction
Single Container Integrated Data Center
Single container integrated data center adopts the All-in-One design concept, which means that the data center infrastructure, such as IT cabinets, sealed aisles, cooling systems, power supply and distribution systems, fire protection systems, security and monitoring systems and auxiliary areas are partially or completely integrated in an ISO freight container (20', 40', 53' or customized size). It offers flexible layout options with dual-row cabinets with cold/hot aisles or single-row cabinets with cold/hot aisles, providing customers with a new data center solution that enables rapid deployment, high energy efficiency, and flexible scalability.
● A single 20' container can accommodate 5 standard racks; a single 40' container can accommodate 8-12 standard racks.
● Delivery period: as short as 2 months (beginning from design to product delivery, but excluding shipping)
Application Scenarios
  • Small computer rooms, Small IDCs
  • Base station construction
  • Edge cloud computing
Advantages
Traditional Civil Engineering Structures
  • Prolonged Construction Period
    The construction period varies from 18 to 24 months, leading to a prolonged investment recovery period and increased uncertainty.
  • High Comprehensive Costs
    Projects are completed through manual operations, with high on-site installation costs, extensive project management, significant energy loss, and limited room for cost optimization.
  • Low Standardization
    Customer requirements are non-standard, with a high degree of customization, making it difficult to achieve standardization and delivery at scale.
  • Severe Construction Pollution
    A large amount of wet work is used, consuming and wasting a significant amount of on-site building materials, water and electricity resources, with a low material recycling rate. This generates a large amount of dust, waste gas, and construction waste, producing a significant amount of carbon emissions during the construction process.
Prefab Modular Data Center
  • Short Construction Period
    Taking a 20MW overseas data center project as an example, the fastest delivery time is less than 7 months.
  • Low Comprehensive Cost
    Interior decoration, equipment installation, pipeline laying and wiring, and integrated commissioning are all prefabricated in the factory, significantly reducing on-site workload.
  • High Standardization
    Full modular design is adopted, with up to 95% pre-integrated in the factory, allowing for standardized and scalable delivery.
  • Energy-Saving and Environmentally Friendly
    A significant portion of the work is completed within the factory, reducing construction waste by 90%, construction water usage by 80%, and increasing the material recycling rate by 80%.
Global Delivery Experience
  • 650MW
    Total Construction Capacity
  • 8000+
    Modular Products
  • 22000+
    Number of Racks Delivered
  • 240000
    Gross Floor Area of Data Center Infrastructure

*Data accumulated as of May 2024
Full Lifecycle Design Capability
Team of 200+ Professional Engineers
Covering specialties such as structural, electrical, HVAC, and architectural engineering;
Over 10 Years of Prefab Modular Product Design Experience
Productized design; Comprehensive application of BIM throughout the entire process;
Full Lifecycle Design Capability
Possesses the capability to provide design support for the entire lifecycle of data centers, including planning and design, production and implementation, and operation and maintenance management.