Prefab Skid Data Center
Program Introduction
Prefab Skid Data Center
Adopting the design concept of traditional construction combined with prefabricated mechanical and electrical equipment skids, it refers to dividing the various functional areas' mechanical and electrical equipment and the integrated pipeline routing, which are housed in the concrete building structure of a traditional data center, into multiple standard skid units. These units are pre-integrated and pre-tested in the factory, which are then transported to the site for hoisting, handling, and installation in designated areas, providing customers with a new type of data center solution that enables rapid deployment, high-efficiency energy saving, and flexible expansion.
● It is suitable for new civil construction machine rooms and machine room renovation.
● Delivery period: 3 months (beginning from design to product delivery, but excluding transportation)
Application Scenarios
  • Civil architecture machine room
  • IT machine room renovation
Advantages
Traditional Civil Engineering Structures
  • Prolonged Construction Period
    The construction period varies from 18 to 24 months, leading to a prolonged investment recovery period and increased uncertainty.
  • High Comprehensive Costs
    Projects are completed through manual operations, with high on-site installation costs, extensive project management, significant energy loss, and limited room for cost optimization.
  • Low Standardization
    Customer requirements are non-standard, with a high degree of customization, making it difficult to achieve standardization and delivery at scale.
  • Severe Construction Pollution
    A large amount of wet work is used, consuming and wasting a significant amount of on-site building materials, water and electricity resources, with a low material recycling rate. This generates a large amount of dust, waste gas, and construction waste, producing a significant amount of carbon emissions during the construction process.
Prefab Modular Data Center
  • Short Construction Period
    Taking a 20MW overseas data center project as an example, the fastest delivery time is less than 7 months.
  • Low Comprehensive Cost
    Interior decoration, equipment installation, pipeline laying and wiring, and integrated commissioning are all prefabricated in the factory, significantly reducing on-site workload.
  • High Standardization
    Full modular design is adopted, with up to 95% pre-integrated in the factory, allowing for standardized and scalable delivery.
  • Energy-Saving and Environmentally Friendly
    A significant portion of the work is completed within the factory, reducing construction waste by 90%, construction water usage by 80%, and increasing the material recycling rate by 80%.
Global Delivery Experience
  • 375MW
    Total Construction Capacity
  • 8000+
    Modular Products
  • 25000+
    Number of Racks Delivered
  • 240000
    Gross Floor Area of Data Center Infrastructure

*Data accumulated as of May 2024
Full Lifecycle Design Capability
Team of 200+ Professional Engineers
Covering specialties such as structural, electrical, HVAC, and architectural engineering;
Over 10 Years of Prefab Modular Product Design Experience
Productized design; Comprehensive application of BIM throughout the entire process;
Full Lifecycle Design Capability
Possesses the capability to provide design support for the entire lifecycle of data centers, including planning and design, production and implementation, and operation and maintenance management.